On the first block of the Belarusian NPP are preparing to load nuclear fuel simulators
The main stage of preparation for loading of fuel assembly simulators began at power unit No. 1 of the Belarusian NPP, BelTA learned from the press service of the general designer and the general contractor of the construction - ASE (engineering division of the Rosatom State Corporation)