Наверх

Expert Opinion

29.12.2018

On the first block of the Belarusian NPP are preparing to load nuclear fuel simulators

The main stage of preparation for loading of fuel assembly simulators began at power unit No. 1 of the Belarusian NPP, BelTA learned from the press service of the general designer and the general contractor of the construction - ASE (engineering division of the Rosatom State Corporation)